Regulation (EU) 2025/40 applies from 12 August 2026, but not every detailed requirement begins on that date. Use the legal trigger for the exact packaging and monitor implementing and delegated acts.

Start my free PPWR check

No card required · Review the route and missing information first

11 February 2025 and 12 August 2026

The Regulation entered into force on the twentieth day after publication: 11 February 2025. Article 71 provides that it applies from 12 August 2026, subject to the stated exception for Article 67(5).

From the general application date, the manufacturer, importer and distributor duties and the applicable Articles 5–12 requirements need to be assessed. For example, the Article 5(5) limits for PFAS in food-contact packaging apply from 12 August 2026, subject to their terms and overlap rule.

Important later milestones

The Regulation phases in several design, recycled-content, labelling, reuse and waste-management measures. The operative date can be a fixed date, a number of months after an implementing act enters into force, or whichever of the two is later.

  • Harmonised material-composition labelling: from 12 August 2028 or 24 months after the relevant acts enter into force, whichever is later
  • Reusable-packaging labelling: from 12 February 2029 or 30 months after the relevant act, whichever is later
  • Design-for-recycling performance grades: staged from 2030, with the detailed methodology set by delegated acts
  • Minimum recycled-content targets for plastic packaging: staged from 2030
  • Recyclability-at-scale condition: staged from 2035

How to manage a changing timeline

Keep current requirements separate from future planning items in the technical file. Record the legal basis, trigger and source review date instead of treating a target year as a complete instruction.

Review the Commission guidance, implementing and delegated acts, and packaging-specific exceptions before changing artwork, specifications or assessments.

This timeline is a working overview. The precise rule can depend on packaging type, use, exemptions, the date an implementing act enters into force and transitional provisions.

EXACT NEXT STEPS

What to do next

  1. 01

    Identify the exact packaging type and Articles 5–12 requirements that apply now.

  2. 02

    Add future or act-dependent items to a dated monitoring list.

  3. 03

    Recheck official acts before each design, artwork or production release.

SOURCE & REVIEW NOTE

Official sources first

Last reviewed . Requirements and national procedures can change. Current duties and future or act-dependent requirements are identified separately.

Read the methodology

Turn the guidance into a saved packaging record.

Create a free account, save your record and review the planned output before paying.

Start my free PPWR check